Arise…go forth…and conquer….

nwyachts Uncategorized

It has been a few days since I added to this blog, but things have been progressing. As you can see from the picture to the left, the hull is now completely out of the mold and is being prepared for moving to the building where it will be completed. The building where the hull was laid up is not …

Popping the Mold

nwyachts Uncategorized

Today was another banner day. I have been busy all week and unable to get down and take pictures of the bulkheads installed but I guess they are in there as today we split the mold. Here is a picture of the mold before splitting. They have installed the tracks on either side so that once the mold is split, …

Ready for Bulkheads and Floor

nwyachts Uncategorized

The crew was mostly off to lunch so I had a chance to get some good shots of the inside of the hull. As you will notice, the stringers are molded in making the hull and stringers one piece. The areas where the port lights and hawes holes go are of solid (not cored) fiberglass. In the left picture you …

The Laying of the Keel

nwyachts Uncategorized

Today is a big day, one that we have been anticipating since the beginning of our project. It is the first day in building the boat. If it were in olden times, it would be considered the “laying of the keel”. Today we infused the hull. In previous postings you have seen the mold with the dry stack of materials …

NW 42: Progress Report

nwyachts Uncategorized

Hull in process of having inner layers of mat installed. Note stringers to be infused integrally to the hull. Stern sections showing stringers and aft bilge area of the wide keel. Another look at the stringers; one has been covered with mat, the other will soon be covered. The hull is nearly ready to have the resin infused into the …

NW 42: Progress Report

nwyachts Uncategorized

The gelcoat has been applied in the mold, the first layers of glass are in place and the Kevlar (dark yellow color) is visible in the forward section. Workers are placing Corecell coring material into the mold prior to the infusion process. Corecell is placed over the Kevlar. Kevlar is on the outside to protect the hull in case of …