Getting Ready for #2

nwyachts Uncategorized

Paolo, Stuart (standing), and Don are inspecting the bow thruster tube installation.
(Left to Right) Jamie, Phil, and Dave are discussing the plumbing runs that will be under the forward cabin sole. These are all pre assembled out of the boat to make the installation process more efficient. After this discussion, it was decided to change to a better plumbing material. We felt that the type used as seen in the picture might be prone to leaks in the future.

Above is one half of the fuel tank mold. The laminators are doing the dry stack prior to infusing the part.

Not letting any grass grow under their feet, the lamination department is re-assembling the mold in preparation of molding hull #2.